LNG Canada CEO Andy Calitz announces project proceeding to engineering and environmental assessment, joined by officials from PetroChina, Mitsubishi and Korea Gas as well as Premier Christy Clark and Natural Gas Development MInister Rich Coleman, April 30, 2014.

Shell postpones LNG decision to late 2016

Shell, Mitsubishi, Korea Gas and PetroChina agree to stick with Prince Rupert project despite world-wide oil and gas price slump

With a world-wide slump in oil and natural gas prices extending further than expected, the Shell-led liquefied natural gas project proposed for Kitimat has delayed its final investment decision until the end of the year.

Backed by a consortium of Shell Canada, Korea Gas, Mitsubishi and PetroChina, the LNG Canada project is a key part of the B.C. government’s bid to enter the global LNG export market. Along with delays on the Petronas-led Pacific Northwest LNG proposed for Prince Rupert, the chances of a large LNG project being under construction by the 2017 provincial election have faded.

Premier Christy Clark was attending an industrial development conference in Ottawa when the delay was revealed in Shell’s quarterly update. As with other global energy companies, the glut of oil resulted in a 44 per cent in earnings for Shell compared to the same quarter last year.

Clark, who rode the prospect of an LNG revenue bonanza to victory in the 2013 B.C. election, acknowledged that the delay is significant.

“What I was pleased to see, though, is that Shell has reconfirmed its intention to make a final investment decision this year, even in these very uncertain times,” Clark said.

LNG Canada CEO Andy Calitz was attending the same conference and he noted that the delay means all four international partners have agreed to stay with the project.

“LNG Canada is in great shape as a project,” Calitz said. “We have all our federal and provincial environmental approvals in place, and the National Energy Board recently decided that they support a 40-year export licence.”

Related: NDP MP seeks tax break for Douglas Channel LNG

Another factor in the delay is the ongoing Shell takeover of British Gas Group, which had its own proposal to build a pipeline and LNG terminal in the Prince Rupert area.

LNG Canada has an agreement with TransCanada Corp. to build a pipeline through the Rocky Mountains from northeastern B.C., where Shell and others have major gas drilling operations in the Montney shale near Dawson Creek and other gas-rich formations.

Pacific Northwest LNG is still waiting for its federal environmental permit, after redesigning its LNG tanker port proposed for Lelu Island near the Prince Rupert port. Local protests have dogged the project over its potential impact on salmon in the Skeena River.


Just Posted

VIDEO: Serious crash in Langley (updated)

Fraser closed near 232 street

Langley School District replaces fountains with water bottle filling stations

After lead found in water, district installs filtering system

Abattoir proposal has south Langley residents on edge

Opponents to poultry slaughterhouse application say aquifer could be at risk

Metro gas prices hit 155.7 cents a litre and higher

Lower Mainland could see 1.60 cents by April

Auditors couldn’t tell if Fraser Health executives bought booze on taxpayers’ dime

Review from 2014 says one administrator bought Bose headphones on company credit card

Ottawa proposes restricted pot labels, packages

Packaging will include red stop sign with marijuana leaf and ‘THC’

Painting of B.C. lake by Winston Churchill sells for $87,000

Churchill had painted the work in 1929 during visit to an area near Field

New lead in one of six B.C. searches that remain unresolved

New details in case of couple who’d been flying from Cranbook to Kamloops when plane disappeared

UPDATE: Surrey man wanted in ‘vicious’ attack on autistic man has criminal history

Ronjot Singh Dhami, 25, is wanted for one count of aggravated assault

Former Lower Mainland city councillor in court for sentencing

Dave Murray was convicted of sexual assault in fall.

B.C. announces $175 million to cut hip, knee surgery wait times

Premier John Horgan said money will allow for a 34-per-cent increase in surgeries

Starbucks to unveil latest creation: crystal ball frappuccino

The limited-edition drink will be available starting March 22

Eight B.C. restaurants among website’s top 100 in Canada for night out

Seven in Vancouver and one in White Rock make OpenTable’s list of popular spots

B.C.-pioneered wood construction on a roll internationally

Washington state considers mandatory engineered wood for public buildings

Most Read