B.C. pauses Massey bridge work to conduct new review

Minister says previous reviews by the Liberals may not have looked at all possibilities

The provincial government has put a hold construction of the bridge to replace the George Massey tunnel to take its own look on how best to replace the corridor.

Transportation Minister Claire Trevena announced the independent review, saying previous reviews by the Liberal government may not have looked at all possibilities.

The decision for a new review is supported by the B.C. Greens, party leader Andrew Weaver said in a statement.

“There’s a sense that not all the options were thoroughly examined,” Trevena told reporters at a news conference Wednesday.

The review will “look at all the options,” while the ministry works with local politicians on what they’d like to see.

About $70 million has already been spent on the $3.5 billion new crossing, including the building of a new counterflow lane on the Alex Fraser Bridge to help relieve congestion in the area while the project’s plan is sorted.

Recommendations from the review could include upgrades to the tunnel, twinning the tunnel, a bridge, or a mix of the two, Trevena said.

READ MORE : Groundbreaking of new Massey Tunnel replacement bridge met with protester

READ MORE: Massey Tunnel replacement debate spinning its wheels

In the meantime, procurement of the previous Massey project has been cancelled, she said, despite bids being placed.

When asked if this means the project is back at square one, Trevena said the review will build off some of the “good” work already done by the previous leadership since former premier Christy Clark announced interest in the project four years ago.

BC Hydro has already spent about $25 million to relocate their transmission poles.

New review not supported by Liberals, PCA

The B.C Liberal caucus say cancelling the current replacement bridge is putting the safety of commuters at risk and puts the possibility for more than 9,000 jobs on the line.

“This is an unacceptable delay for those who travel through the tunnel every day,” Delta South MLA Ian Paton said in a statement.

The Progressive Contractors Association called the decision “disappointing.”

“This crossing is just too important to commuters, communities and industry not to get going with a replacement project as soon as possible,” PCA regional director Rieghardt van Enter said in a release.


@ashwadhwani
ashley.wadhwani@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Just Posted

UPDATE: Man in mid-20s killed in targeted shooting in Abbotsford

Location of shooting the same as where innocent bystander Ping Shun Ao killed in 2015

Giants fall in six-round shootout

Visiting Victoria squad beats Vancouver 4-3 at Langley Events Centre

GALLERY: Giants host Royals in WHL action

Photos from the Vancouver Giants clash with the Victoria Royals at the Langley Events Centre

’Cats Jasper ready to focus on soccer

Langley dual sport athlete set to focus on soccer with UFV

Teens design environmentally friendly invention

Plastic grocery bags transformed into cup coasters that can be used over and over again

UPDATED: SUV fire at Langley mall (with video)

Firefighters respond to Fraser Highway incident

World’s fastest log car made in B.C. sells for $350,000 US

Cedar Rocket auctioned off three times at Barrett-Jackson Co., netting $350,000 US for veterans

Bad timing: Shutdown spoils Trump’s one-year festivities

Trump spends day trying to hash out a deal with Senate Minority Leader Chuck Schumer

RCMP nail sex toy thief

Shop owner plays a role in arrest

Ice-cream-eating bear draws controversy

An Alberta Wildlife Park posted a video this week of one of their bears going through a Dairy Queen drive-through

Police arrest pair after ‘high-risk vehicle takedown’

Vancouver police say replica handgun found in alleged suspects’ vehicle

Fernie, RCMP go to court over city log books in fatal ammonia leak probe

Log books center stage in clashing of investigations between the city and RCMP

B.C.’s biggest pot plant planned for Oliver

Co-founder Tony Holler said the 700,000 sq. ft. facility would produce 100,000 kg of pot per year

Aldergrove played role in 1954 British Empire Games

Author of ‘The Miracle Mile’ explores ’54 Games in local context

Most Read