Pipeline contractor comments on stop work order

Langley company building 216 Street line says its safety procedures exceed industry standards

Work on the 216 Street water pipeline was halted June 21 by WorkSafe BC.

The company building the 216 Street leg of a Langley Township water pipe line project that was shut down by WorkSafe BC says it follows strict safety standards.

In a written statement issued Thursday, Pedre Contractors Ltd. said the company has years of experience building major pipeline projects and follows procedures for working in confined spaces that exceed industry standards.

Pedre said WorkSafe has asked the company to clarify its procedures.

“They’ve requested clarity and we are in the process of responding to their request.”

The Pedre statement said it was not a company representative who told WorkSafe that adding more hatches to the pipeline project (as WorkSafe has proposed) might breach the warranty, nor did the company say adding hatches could cause a risk of bacterial contamination in the water pipe.

The company did warn changing the design of the pipe would mean construction delays, the Pedre statement said.

Work on the pipeline was halted by the provincial workplace safety regulator on June 21.

Township water resources and environment manager Kevin Larsen told the Times the design of the pipeline followed “past industry practice” for design and construction.

The 14-kilometre-long East Langley Water Supply project is the biggest project ever undertaken by the Township of Langley’s engineering department.

Work started May 1 and is scheduled to run Monday to Friday until December of this year.

Just Posted

Guatemala mission offers hope, health

Peninsula team to visit remote villages, build a home, in Piedra Blanca

Annual Aldergrove Fair announces 2019 theme: ‘Aldy on the Moon’

The fair is gathering space memorabilia as well as some of the people involved in the space program.

Guitar festival host performs in upcoming show

Langley’s Don Hlus is hosting and performing in the Fraser Valley Guitar Festival on Feb. 23.

Cloverdale nurse, Langley truck driver awarded for saving a police officer’s life

Angela Feltrin and Earl Hanes thanked by B.C. RCMP’s top cop

Aldergrove’s Fraser Highway to unveil another Starbucks

A commercial building on Fraser Highway will open its doors to two businesses instead of one.

VIDEO: Canada’s flag turns 54 today

The maple leaf design by George Stanley made its first appearance Feb. 15, 1965

Former B.C. premier Gordon Campbell accused of sexual touching

Accuser went to police, interviewed by Britian’s Daily Telegraph

Avalanche control planned tomorrow on Highway 1

The highway will be closed in the morning east of Revelstoke

Judge rules Abbotsford home must be sold after son tries to evict mom

Mom to get back down payment and initial expenses

Mayors approve SkyTrain extension to UBC

Next step is a business plan and public consultation

Trump officially declares national emergency to build border wall

President plans to siphon billions from federal military construction and counterdrug efforts

Snow turns to slush, rain as it warms up across B.C.’s south coast

Some areas are already covered by more than half a metre of snow following three separate storms

Father to be charged with first-degree murder in Amber Alert case

11-year-old Riya Rajkumar was found dead in her father’s home in Brampton, Ontario

Police track armed kidnapping across Thompson-Okanagan

RCMP allege it was a targeted crime believed to be linked to the drug trade

Most Read